Essential details
MOQ:1
Shipping:Express Delivery, Air freight, Land freight, Ocean freight
Product Introduction
Product Features: This product utilizes a new, environmentally friendly formula that completely eliminates phosphates, contains no heavy metals, and has a weakly acidic pH. After a simple neutralization treatment, it can be directly discharged, fully complying with environmental regulations.
This product is easy to use, with easy tank addition and maintenance, and reduces sediment production by over 90% during use.
It is fully compatible with existing coating processes and equipment, eliminating the need for major equipment modifications.
The process is simple, with a fast film-forming rate, significantly reducing overall costs such as water consumption, wastewater treatment, energy, and labor, resulting in a highly cost-effective solution.
Application: This product is suitable for co-production of workpieces made of various materials, including hot and cold plates and strip steel, and is suitable for coating processes such as electrophoresis and spray coating.
Instructions:
1. Processing Temperature: Room Temperature
2. pH: 4.2-5.2
3. Immersion Time: 5-10 minutes
4. Spraying Time: 2-3 minutes
5. Transition Temperature: 3-5
Packaging: 25kg or 30kg plastic drums. Storage: This product should be stored in a dry, cool and ventilated warehouse. The recommended storage temperature is 5-35°C. Avoid sunlight and rain during storage and transportation. Under normal storage conditions, the shelf life of this product is 1 year.
This product is easy to use, with easy tank addition and maintenance, and reduces sediment production by over 90% during use.
It is fully compatible with existing coating processes and equipment, eliminating the need for major equipment modifications.
The process is simple, with a fast film-forming rate, significantly reducing overall costs such as water consumption, wastewater treatment, energy, and labor, resulting in a highly cost-effective solution.
Application: This product is suitable for co-production of workpieces made of various materials, including hot and cold plates and strip steel, and is suitable for coating processes such as electrophoresis and spray coating.
Instructions:
1. Processing Temperature: Room Temperature
2. pH: 4.2-5.2
3. Immersion Time: 5-10 minutes
4. Spraying Time: 2-3 minutes
5. Transition Temperature: 3-5
Packaging: 25kg or 30kg plastic drums. Storage: This product should be stored in a dry, cool and ventilated warehouse. The recommended storage temperature is 5-35°C. Avoid sunlight and rain during storage and transportation. Under normal storage conditions, the shelf life of this product is 1 year.